Technovation design/builds highly functional, energy efficient USP 797 cleanroom pharmacies compliant to USP 797 (including proposed 2007 revisions - expected to be put into practice in late 2007 or early 2008).We are currently conducting USP 797 projects for Walter Reed, MCV and all Bon Secours Hospitals in VA among many others.

For short presentation on USP 797 Facility Requirements: Short Presentation.

USP 797 PHARMACY DESIGN/BUILD AND CONSULTING SERVICES

Phase I - Preliminary Development and Consulting

  • LOW COST ASSESSMENT OF YOUR PHARMACIES’ USP 797 COMPLIANCE
  • OPTIMIZE PROCESS FLOW WITH PHARMACISTS
  • DEVELOP PHARMACY LAYOUT
  • CONDUCT FIELD SURVEY
  • DEFINE UTILITY REQUIREMENTS
  • DEVELOP BUDGET COST

Cost: $6,000 if project is within 150 miles of Richmond, VA - $6,500 larger distances.

Phase II - Final Engineering Design

  • ENGINEERING SPECIFICATION DEVELOPMENT
  • PHARMACY EQUIPMENT SELECTION
  • DETAIL DESIGN DESIGN/CONSTRUCTION DOCUMENTS
  • FINAL COST DEVELOPMENT

Phase III - Construction and CM Services

  • EXPERT CONSTRUCTION MANAGEMENT INCLUDING CHANGE CONTROL
  • CLEAN CONSTRUCTION PROTOCOLS
  • INSTALLATION QUALIFICATION
  • OPERATION QUALIFICATION, COMMISSIONING & CERTIFICATION

Consulting Services

  • ASSISTANCE WITH SOPs
  • ENVIRONMENTAL MONITORING
  • GARMENT & EQUIPMENT SELECTION
  • CLEANING & DISINFECTION

Advantage of Technovation USP 797 Pharmacy Design

  • Contiguous Class 5 Zone - Eliminates need for restrictive flow benches thus improving productivity. No Flow Benches are required.

  • Energy Efficient Design - 2003 Savings per 400 ft2 Pharmacy are as follows:
    Mid Atlantic Region: $ 10,345
    North East Region:  $15,345
    CA: $17,283

  • Positive and Negative Pressure Room designs.

  • Bactericidal BioPlus® HEPAs.

  • Full computerized Environmental Monitoring system for record keeping.

Presentation Links:

For short presentation on USP 797 Facility Requirements: Short Presentation.

For Full presentation on USP 797 Facility Requirements:  Full Presentation.

View document on " Importance of Design/Build in Successful Construction of USP 797 Pharmacy"

For more information on USP 797 click on links

 

[ Home ][ Contact Us ] [ Downloads ] [ Filters ]  [ Cleanrooms-BSLabs] [ Hospital/USP 797 ]  [ Flow Bench ] [ Links]
 
Please Contact Us with questions or comments about this web site.
Copyright © 2002 Technovation Systems Inc
Last modified: November 02, 2007